Although it’s been quite a long time since our last update, we have spent quite a lot of time at Meydieu. Most of the time has been spent finishing the inside, so there has not been much to put on the Website.
With the winter nearly upon us once again, we decided that we should get the outside finished. The blockwork has been rendered and we have build a wall around the terrace. The terrace should be tiled by the end of the month.
Perhaps November is not the most sensible time to start building a swimming pool, but we want to make sure it’s ready for next summer.
|