November 2004

We’ve made a couple of small changes to the layout of the Website this month.

Work has stopped on the outside because of the weather. The sunny south west isn’t always so sunny in the winter.

We had hoped to lay the new floor downstairs but we didn’t get the underfloor heating pipes in time. It did give us a chance to get on with the plasterboard downstairs. We are still waiting for the stairs. Hopefully we can get them and the floor in before Christmas.

The front door at night.

Looking towards the front from the living room.

The heating equipment did arrive.

Plaster boarding is finished in the downstairs bedroom.

The plaster boarding is nearly finished. The stone wall on the left will stay.

The oil storage tank. .