January 2004

Work started on the 5th of January. The weather was on the wet side of reasonable but not bad enough to have much effect. In January, dividing walls downstairs were demolished, the floor over the cellar was replaced and the first floor was cleared.

The small house is quite cosy so we will not be too uncomfortable.

Work will start in the cellar.

The old timber floor over the cellar has been lifted. The beams need to come out ready for the new floor

New wall for the kitchen.

The “current” electrical system needs some work.

Ready for work upstairs.

The timber floor over the cellar is replaced with a “block and beam” floor.

This is a view towards the kitchen after the walls were taken down. The stairs will also be moved.