April 2006

March was a literally a washout. It seemed like every day we had some rain. We still managed to make some progress with the pool house, and once the roof was on it was possible to get on with the electrics and pump equipment.

The second week in April saw a dramatic change in the weather and progress has been good. The pool is now finished. The first week in May should see the terrace laid. Watch this space!

Apr06-0063

Last Minute adjustments

Apr06-0758

All the technical stuff inside the pool house.

Apr06-0068

Detail of the steps.

Apr06-0073

The liner is in at last.

Apr06-0734
Apr06-0728

The pool house is nearly complete.

Apr06-0753

Just waiting for the liner and some water.

Apr06-0069

The liner being installed.

Apr06-0074

The pool will soon be full.

Apr06-0738

We have been concentrating on the pool since last year, but that doesn’t mean that the garden can be neglected. Linda and Henry help out with some much needed trimming and mowing.

Last month’s pool pictures Click here

Next month’s pool pictures Click here